Estación Ave Cuenca
High speed train station in Cuenca
Cooling peak load: 464 kW
Heating peak load: 423 kW
Vertical closed loop: 90 boreholes 100 m deep
Geothermal heat pumps: 4nº WaterFurnace NKW130
System distribution: Underfloor heating + fan-coils + air treatment units
Date: To be completed in August 2010
Client: Estación Alta Velocidad Cuenca UTE (Construcciones Lujan - Instalaciones Monrabal)
Promoter: ADIF (Ministry of Infrastructures)
Escuela Infantil Nigrán
School in Nigrán - Pontevedra
Heating peak load: 75 kW
Vertical closed loop: 12 boreholes 100m deep
Heat pumps: 1nº WaterFurnace NKW90
System distribution: Underfloor heating
Commissioned: December 2009
Client: Energylab
Bowmore, Isle of Islay, West Highland Housing Association
12 Houses
1 x EKW06 per House
12 x 65m Boreholes
Radiator and Underfloor system and domestic hot water
Commissioned 2005
Gearrannan Black House Village, Isle of Lewis
Renovation of 6 houses & 1 Café
3 x EKW17 heat pump units
Collectors: 6 x 90m bore holes
Underfloor, radiators & domestic hot water
Commissioned 2005
Kirkhaven Hostel
System: Vertical, Closed Loop
Size: 90kW Heating & Hot Water
Collector type: 10 boreholes
Depth: 100m
Completed: August 2006