Commercial Case Studies

Leominster Police Station

Leominster Police Station

System: Vertical Closed Loop
Size: 100kW Cooling
154kW Heating
Collector Type: 23 bore holes
Depth: 100m
Completed: August 2007

North Kent Police PFI

North Kent Police PFI

System: Energy Piles, Closed Loop & Dry Cooler
Size: 550kW Heating
1,350kW Cooling
Collector type: 250 Piles to 23m
80 Bores to 100m
Completed: 2007

Paddington Building 3, London

Paddington Building 3, London

System: Energy Piles
Size: 210kW Heating
85kW Cooling
Collector type: 54 Piles
Depth: 25m
Completed: 2006

Plas Maldwyn Developments, Newtown

Plas Maldwyn Developments, Newtown

System: Vertical, Closed Loop
Size: 35 x 8kW Heating & Cooling
Collector Type: 35 Boreholes
Depth: 98m
Completed: 2005

Grantown Grammar School

Grantown Grammar School

System: Vertical, Closed Loop
Size: 180 kW Heating
Collector type: 20 boreholes
Depth: 100m
Completed: 2006