The Heat Pump Experts

Commercial Case Studies

Solihull Inclusive Learning Centre

Solihull Inclusive Learning Centre

System: Horizontal, Closed Loop
Size: 350kW Heating
Collector type: 54 Trenches, 100m Long
Completed: 2006

Swinhay House, Gloucestershire

Swinhay House, Gloucestershire

System: Closed Pond Loop
Size: 200kW Heating & Cooling
Collector type: 42 x 100m Coils
Completed: 2007

Walsingham Church, Norfolk

Swinhay House, Gloucestershire

1 x EKW17 heat pump unit
Collector: 3 x 90m bore holes
Full underfloor heating
Completed: 2006

Project Kimberley

Project Kimberley

Simultaneous Heating & Cooling
Heating Load: 518kW
Cooling Load: 200kW
Heat Pumps: 5No. EKW130
42No. Slinkies & Slim Jims
COP - 3.4 - 4.7
Commissioned: September 2009

Loughborough Sports Park

Loughborough Sports Park

Simultaneous Heating & Cooling
Heating Load: 80kW
Cooling Load: 67kW
Heat Pumps: 1No. EKW90 & 3No. EKW17
15No. 100m Bore Holes
COP - 3.4 - 5.5
Commissioned: November 2009